Forms and Publications

Enter all or part of a document title, description or number:     

Browse By Subject  |  Most Requested  |  Required L&I Workplace Posters  |  Spanish Language Documents  |  Show all L&I Forms/Pubs


Results for: inspector
View:    Sort by:       
Title/Description:

Keyword search within results:  
Type:

Application for Amusement Ride Inspector Certification

Application to be certified as an amusement ride inspector.



Form
F500-065-000
 
Application for Certificate of Competency as an Inspector of Pressure Retaining Items
To apply for a certificate of competency as an Inspector of Pressure Retaining items. You can only mail or fax this form to L&I. Emailed forms are not accepted. NOTE: Applications MUST be received no later than 30 days prior to the exam date. Incomplete applications WILL NOT be accepted.

Form
F620-040-000
 
Chief Inspector Clarification and Interpretation Request Form
Chief Inspector Clarification and Interpretation Request Form

Form
F620-056-000
 
Affidavit for Amusement Rides
Affidavit of experience to apply for cetification as a Amusement Ride Inspector.

Form
F500-066-000
 
Non-Compliance Report - Boiler & Pressure Vessel Inspection
Used by L&I inspectors when a boiler or pressure vessel does not pass inspection. You can only mail or fax this form to L&I. E-mailed forms are NOT accepted.

Form
F620-012-000
 
Board of Boiler Rules Interpretation and Revision Request Form
Used to submit written requests for interpretations and revisions to the definitions, rules and regulations found in WAC 296-104. These must be submitted 45 days prior to the Board of Boiler Rules Meeting date. To use this form, left click on the link and select SAVE TARGET AS and save to your desktop. Open in WORD, complete form, select PRINT, SEND TO, MAIL or DELIVERY DOCUMENT ONLY in care of Chief, Boiler Inspector.

Form
F620-017-000
 
Shop and Field Inspection Report
Used by L&I inspectors when they inspect boilers.

Form
F620-027-000
 
Historical Boilers Inspection Guideline
Inspection sheet for boiler inspectors. 4 pages.

Form
F620-043-000
 
Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers
Checklist which reflects the most common violations encountered by Field Inspectors. This checklist should be gone through prior to requesting inspection of Hot Water Heating or Hot Water Supply Boilers

Form
F620-050-000
 
Pre-Inspection Checklist for Potable Water Heaters - ASME "HLW" Stamped Water Heaters
Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Potable Water Heaters-HLW

Form
F620-051-000
 
Pre-Inspection Checklist for Low Pressure Steam Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Low Pressure Steam Boilers



Form
F620-052-000
 
Pre-Inspection Checklist for High Pressure Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of High Pressure Boilers



Form
F620-053-000
 
Electric / Gas Conversion Pre-Inspection Checklist

This checklist is generic in content and may not include all requirements for your particular installation. The manufacturer's installation instruction must be adhered to and available to the inspector at the time of the inspection.



Form
F622-013-000
 
Gas Piping Test Affidavit

You fill out, print and make a copy of this form on your company's letterhead. This affidavit must be available for the L&I inspector when the inspection is made.



Form
F622-048-000
 
Roof Affidavit and Structural Inspection Request

The purpose of the manufactured home roof affidavit is to provide timely inspections and communications between the contractor and/or owner and FAS inspectors and field staff.

A structural inspection request questionnaire will not be required when a roof change out occurs if no structural changes are made in the roof sub-surface and roof cavity. Example: Repairing or replacing the roof trusses, rafters, ridge beam and the replacement of not more than (4) 4’x 8’ of roof sheathing.



Form
F622-076-000
 
Elevator Five-Year Safety Test Report

This report is used by L&I for its five-year safety inspection of an elevator.



Form
F621-051-000
 
Board of Boiler Rules Extension of Inspection Frequency Request Form
Board of Boiler Rules Extension of Inspection Frequency Request Form

Form
F620-055-000
 
Inservice Inspection checklist
Inservice Inspection checklist for power boilers, low pressure boilers, pressure vessels, and hot water boilers.

Form
F620-060-000
 





End of main content, page footer follows.

Access Washington official state portal

© Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.