Get a Form or Publication: pipe

Your search for "pipe" returned 2 documents.

Title Type Number
Alteration Polybutylene Re-Pipe Pre-Inspection Checklist

This checklist is used by the contractor when altering a polybutylene re-pipe. Be sure you can answer YES to all questions before calling L&I for an inspection.

Form F622-053-000
Asbestos Abatement Project Notice of Intent and L&I DOSH Asbestos Program

Notice is not required for any asbestos project involving less than forty-eight (48) square feet of surface area, or less than ten (10) linear feet of pipe unless the surface area of the pipe is greater than forty-eight (48) square feet. Get instructions to complete the form.

Form F413-025-000



End of main content, page footer follows.

Access Washington official state portal

© Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.