Find a Rule By Number
All L&I Rules | Administration | Claims & Insurance | Safety | • Trades & Licensing | Workplace RightsTrades & Licensing Rules
WACs by Chapter Number (all Labor & Industries’ rules start with 296):
|
05
09
43
46B
49A
96
104
150
150C
150F
150M
150P
150R
150T
150V
200A
310
400A
403A
|
| Chapter WAC # | Section | Rule Title/Topic | Scope of Rule |
|---|---|---|---|
| 296-05 | Apprenticeship | The Washington State Apprenticeship and Training Act (chapter 49.04 RCW) establishes the Washington state apprenticeship and training council (WSATC) and designates as its administrative arm the apprenticeship section of the department of labor and industries. | |
| 296-09 | Board of boiler rules -- procedure | Various rules about the practice and procedures for the board of boiler rules. | |
| 296-43 | Heating installations -- Cable, radiant, soil, etc. | Regulations for heating cables and heating elements, including those embedded in soil, sand and driveways | |
| 296-46B | Electrical safety standards, administration, and installation | Various regulations for electrical safety standards, administration and installation. | |
| 296-49A | Director's factory assembled structures advisory board | Establishes a uniform means of communication between the department and persons, firms or corporations engaged in the manufacture of factory assembled structures. | |
| 296-96 | Elevators | The purpose of this chapter is to: (1) Provide for the safe mechanical and electrical operation, construction, installation, alteration, inspection, relocation, and repair of conveyances; and (2) Ensure that all such operation, construction, installation, alteration, inspection, and repair subject to the provisions of this chapter will be reasonably safe to persons and property and in conformity with the provisions of this chapter and the applicable statutes of the state of Washington. | |
| 296-104 | Board of boiler rules -- Substantive | Apply to all boilers and unfired pressure vessels except those exempt under RCW 70.79.080 | |
| Chapter WAC # | Section | Rule Title/Topic | Scope of Rule |
| 296-150 | Manufactured homes | Requires that any alteration to a manufactured home be approved by the department. | |
| 296-150C | Commercial coaches | Applies to the approval of commercial coach manufacturers, dealers and to any person who manufactures or alters the plumbing, mechanical, or electrical system or the body or frame of a commercial coach. | |
| 296-150F | Factory-built housing and commercial structures | Applies to the approval: (a) Of factory-built structures used for residences or commercial purposes; and (b) After occupancy of a factory-built house or commercial structure, all inspections are done by the local enforcement agency. | |
| 296-150M | Factory Assembled Structures, Factory-built Housing & Commercial Structures | ||
| 296-150M | Factory Assembled Structures, Factory-built Housing & Commercial Structures | ||
| 296-150P | Recreational park trailers | Applies to: (a) Manufacturers, dealers and individuals who build for sale, sell, or lease recreational park trailers in Washington state; and (b) Manufacturers, dealers, and individuals who alter recreational park trailers for sale or lease in Washington state. | |
| 296-150R | Recreational vehicles | Applies to: (a) Manufacturers, dealers and individuals who build for sale, sell, or lease recreational vehicles in Washington state; and (b) Manufacturers, dealers, and individuals who alter recreational vehicles for sale or lease in Washington state. | |
| 296-150T | Factory-built temporary worker housing structures | Applies to the approval: (a) Of factory-built temporary worker housing structures; and (b) After occupancy of a factory-built temporary worker housing structure, all inspections are done by the department of health. | |
| Chapter WAC # | Section | Rule Title/Topic | Scope of Rule |
| 296-150V | Conversion vendor units and medical units | Applies to the approval of conversion vendor unit and medical unit manufacturers, dealers, and to any person who manufactures or alters the plumbing, mechanical, or electrical system of a conversion vendor unit or medical unit. | |
| 296-200A | Contractor registration | The goal of this chapter is to: (1) Reduce the paperwork required for contractor registrations. (2) Clarify issues related to suits against contractors and the collection of court judgments. (3) Ensure that the contractors registration law (chapter 18.27 RCW) is efficiently and properly administered. | |
| 296-310 | Farm labor contracting | Various licensing and contract requirements for farm labor contracting | |
| 296-400A | Plumbers certification | Various rules about certifcation and permits for plumbers | |
| 296-403A | Amusement rides or structures | Various requirements for amusement rides and structures |
