Prevailing Wage

ADAMS County - Effective: 3/4/2009

Close X   

Prevailing Wage Rates for Public Works Contracts

Select an Effective Date
I want to look up    
I want to search    
Please select a county

Attention: Due to changes that may occur in wage rates between the publication date on Feb. 1 and the effective date of March 3, it is critical for all parties utilizing the March 3 wage rates to confirm they are using the correct rates on or after March 3.

Any apprentice not registered with the Washington State Apprenticeship and Training Council must be paid prevailing journey level wages. To verify apprentice registration, call (360) 902-5324.


ADAMS County -- Apprentices -- 3/4/2009 -- Benefit Code Key

Stage of Progression & Hour Range Prevailing
Wage
Overtime
Code
Holiday
Code
Note
Code
ASBESTOS ABATEMENT WORKERS
1: 0 - 1000 Hours - 60.00% $21.35 1M 5D
2: 1001 - 2000 Hours - 70.00% $23.61 1M 5D
3: 2001 - 3000 Hours - 80.00% $25.88 1M 5D
4: 3001 - 4000 Hours - 90.00% $28.14 1M 5D
BOILERMAKERS
1: 0 - 1000 Hours - 70.00% $43.26 1C 5N
2: 1001 - 2000 Hours - 75.00% $44.95 1C 5N
3: 2001 - 3000 Hours - 80.00% $46.63 1C 5N
4: 3001 - 4000 Hours - 85.00% $48.32 1C 5N
5: 4001 - 5000 Hours - 90.00% $50.00 1C 5N
6: 5001 - 6000 Hours - 95.00% $51.69 1C 5N
BRICK AND MARBLE MASONS
1: 0 - 700 Hours - 40.00% $21.58 2M 5A
2: 701 - 2100 Hours - 55.00% $25.57 2M 5A
3: 2101 - 2800 Hours - 60.00% $26.90 2M 5A
4: 2801 - 3500 Hours - 70.00% $29.55 2M 5A
5: 3501 - 4200 Hours - 80.00% $32.21 2M 5A
6: 4201 - 5000 Hours - 90.00% $34.86 2M 5A
CARPENTERS
CARPENTER
1: 0 - 500 Hours - 60.00% $21.34 1B 5A 8N
2: 501 - 1000 Hours - 65.00% $22.67 1B 5A 8N
3: 1001 - 1700 Hours - 70.00% $24.01 1B 5A 8N
4: 1701 - 2400 Hours - 75.00% $29.60 1B 5A 8N
5: 2401 - 3100 Hours - 80.00% $30.93 1B 5A 8N
6: 3101 - 3800 Hours - 85.00% $32.27 1B 5A 8N
7: 3801 - 4500 Hours - 90.00% $33.61 1B 5A 8N
8: 4501 - 5200 Hours - 95.00% $34.94 1B 5A 8N
MILLWRIGHT AND MACHINE ERECTORS
1: 1st Period - 70.00% $25.41 1B 5A 8N
2: 2nd> Period - 75.00% $31.10 1B 5A 8N
3: 3rd Period - 80.00% $32.53 1B 5A 8N
4: 4th Period - 85.00% $33.97 1B 5A 8N
PILEDRIVER/CARPENTER
1: 0 - 500 Hours - 60.00% $21.34 1B 5A 8N
2: 501 - 1000 Hours - 65.00% $22.67 1B 5A 8N
3: 1001 - 1700 Hours - 70.00% $24.01 1B 5A 8N
4: 1701 - 2400 Hours - 75.00% $29.60 1B 5A 8N
5: 2401 - 3100 Hours - 80.00% $30.93 1B 5A 8N
6: 3101 - 3800 Hours - 85.00% $32.27 1B 5A 8N
7: 3801 - 4500 Hours - 90.00% $33.61 1B 5A 8N
8: 4501 - 5200 Hours - 95.00% $34.94 1B 5A 8N
PILEDRIVER/DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING, OR CREOSOTE TREATED MATERIAL ON ALL PILING
1: 0 - 500 Hours - 60.00% $21.50 1B 5A 8N
2: 501 - 1000 Hours - 65.00% $22.85 1B 5A 8N
3: 1001 - 1700 Hours - 70.00% $24.20 1B 5A 8N
4: 1701 - 2400 Hours - 75.00% $29.80 1B 5A 8N
5: 2401 - 3100 Hours - 80.00% $31.15 1B 5A 8N
6: 3101 - 3800 Hours - 85.00% $32.50 1B 5A 8N
7: 3801 - 4500 Hours - 90.00% $33.85 1B 5A 8N
8: 4501 - 5200 Hours - 95.00% $35.20 1B 5A 8N
CEMENT MASONS
1: 0 - 1000 Hours - 60.00% $23.74 1N 5D
2: 1001 - 2000 Hours - 70.00% $26.26 1N 5D
3: 2001 - 3000 Hours - 80.00% $28.77 1N 5D
4: 3001 - 4000 Hours - 90.00% $31.29 1N 5D
DRYWALL TAPERS
1: 0 - 500 Hours - 50.00% $11.55 1P 5A
2: 501 - 750 Hours - 50.00% $16.10 1P 5A
3: 751 - 1500 Hours - 55.00% $17.26 1P 5A
4: 1501 - 2250 Hours - 65.00% $21.61 1P 5A
5: 2251 - 3000 Hours - 75.00% $23.91 1P 5A
6: 3001 - 3750 Hours - 85.00% $28.25 1P 5A
7: 3751 - 4500 Hours - 90.00% $29.41 1P 5A
ELECTRICIANS - INSIDE
1: 0 - 1000 Hours - 45.00% $19.08 1E 5I
2: 1001 - 2000 Hours - 50.00% $20.51 1E 5I
3: 2001 - 3500 Hours - 55.00% $25.35 1E 5I
4: 3501 - 5000 Hours - 65.00% $28.79 1E 5I
5: 5001 - 6500 Hours - 75.00% $32.24 1E 5I
6: 6501 - 8000 Hours - 85.00% $35.68 1E 5I
ELECTRICIANS - POWERLINE CONSTRUCTION
JOURNEY LEVEL LINEPERSON
1: 0 - 1000 Hours - 60.00% $33.91 4A 5A
2: 1001 - 2000 Hours - 63.00% $35.18 4A 5A
3: 2001 - 3000 Hours - 67.00% $36.88 4A 5A
4: 3001 - 4000 Hours - 72.00% $38.98 4A 5A
5: 4001 - 5000 Hours - 78.00% $41.51 4A 5A
6: 5001 - 6000 Hours - 86.00% $44.89 4A 5A
7: 6001 - 7000 Hours - 90.00% $46.59 4A 5A
POLE SPRAYER
1: 0 - 1000 Hours - 85.70% $44.76 4A 5A
2: 1001 - 2000 Hours - 89.80% $46.49 4A 5A
3: 2001 - 3000 Hours - 92.80% $47.76 4A 5A
ELECTRONIC TECHNICIANS
ELECTRONIC TECHNICIANS JOURNEY LEVEL
1: 0 - 2000 Hours - 50.00% $8.55 1
2: 2001 - 4000 Hours - 60.00% $8.55 1
3: 4001 - 6000 Hours - 70.00% $8.55 1
4: 6001 - 7000 Hours - 80.00% $9.66 1
5: 7001 - 8000 Hours - 90.00% $10.86 1
ELEVATOR CONSTRUCTORS
MECHANIC
1: 0 - 1000 Hours - 50.00% $21.46 4A 6Q
2: 1001 - 1700 Hours - 55.00% $43.49 4A 6Q
3: 1701 - 3400 Hours - 65.00% $48.03 4A 6Q
4: 3401 - 5100 Hours - 70.00% $50.91 4A 6Q
5: 5101 - 6800 Hours - 80.00% $55.55 4A 6Q
GLAZIERS
1: 0 - 1000 Hours - 55.00% $8.55 1
2: 1001 - 2000 Hours - 60.00% $8.55 1
3: 2001 - 3000 Hours - 65.00% $8.55 1
4: 3001 - 4000 Hours - 70.00% $8.55 1
5: 4001 - 5000 Hours - 80.00% $8.80 1
6: 5001 - 6000 Hours - 90.00% $9.90 1
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC
1: 0 - 1600 Hours - 60.00% $17.46 1
2: 1601 - 3200 Hours - 70.00% $20.37 1
3: 3201 - 4800 Hours - 80.00% $23.28 1
4: 4801 - 6400 Hours - 90.00% $26.19 1
HOD CARRIERS & MASON TENDERS
1: 0 - 1000 Hours - 60.00% $22.55 1M 5D
2: 1001 - 2000 Hours - 70.00% $24.96 1M 5D
3: 2001 - 3000 Hours - 80.00% $27.37 1M 5D
4: 3001 - 4000 Hours - 90.00% $29.78 1M 5D
INSULATION APPLICATORS
1: 0 - 1000 Hours - 50.00% $10.69 1
2: 1001 - 2000 Hours - 60.00% $12.82 1
3: 2001 - 3000 Hours - 75.00% $16.03 1
4: 3001 - 4000 Hours - 90.00% $19.23 1
IRONWORKERS
1: 0 - 750 Hours - 65.00% $26.11 1O 5A
2: 751 - 1500 Hours - 70.00% $27.58 1O 5A
3: 1501 - 2250 Hours - 75.00% $38.51 1O 5A
4: 2251 - 3000 Hours - 80.00% $39.99 1O 5A
5: 3001 - 3750 Hours - 90.00% $42.94 1O 5A
6: 3751 - 4500 Hours - 90.00% $42.94 1O 5A
7: 4501 - 5250 Hours - 95.00% $44.41 1O 5A
8: 5251 - 6000 Hours - 95.00% $44.41 1O 5A
LABORERS
1: 0 - 1000 Hours - 60.00% $21.35 1M 5D
2: 1001 - 2000 Hours - 70.00% $23.61 1M 5D
3: 2001 - 3000 Hours - 80.00% $25.88 1M 5D
4: 3001 - 4000 Hours - 90.00% $28.14 1M 5D
LABORERS - UNDERGROUND SEWER & WATER
1: 0 - 1000 Hours - 60.00% $21.35 1M 5D
2: 1001 - 2000 Hours - 70.00% $23.61 1M 5D
3: 2001 - 3000 Hours - 80.00% $25.88 1M 5D
4: 3001 - 4000 Hours - 90.00% $28.14 1M 5D
LATHERS
1: 0 - 500 Hours - 60.00% $20.94 1B 5A 8N
2: 501 - 1000 Hours - 65.00% $22.24 1B 5A 8N
3: 1001 - 2000 Hours - 70.00% $23.54 1B 5A 8N
4: 2001 - 3000 Hours - 75.00% $29.10 1B 5A 8N
5: 3001 - 4000 Hours - 80.00% $30.40 1B 5A 8N
6: 4001 - 5000 Hours - 85.00% $31.70 1B 5A 8N
7: 5001 - 6000 Hours - 90.00% $33.00 1B 5A 8N
8: 6001 - 8000 Hours - 95.00% $34.31 1B 5A 8N
PAINTERS
1: 0 - 750 Hours - 55.00% $12.91 1
2: 751 - 1500 Hours - 65.00% $15.26 1
3: 1501 - 2250 Hours - 75.00% $17.60 1
4: 2251 - 3000 Hours - 80.00% $18.78 1
5: 3001 - 3750 Hours - 85.00% $19.95 1
6: 3751 - 4500 Hours - 95.00% $22.30 1
PLASTERERS
1: 1st Period - 60.00% $8.55 1
2: 2nd> Period - 70.00% $8.55 1
3: 3rd Period - 80.00% $8.55 1
4: 4th Period - 90.00% $9.00 1
PLUMBERS & PIPEFITTERS
1: 0 - 1000 Hours - 45.00% $38.14 1Q 5A
2: 1001 - 2000 Hours - 50.00% $39.92 1Q 5A
3: 2001 - 3000 Hours - 55.00% $41.71 1Q 5A
4: 3001 - 4000 Hours - 60.00% $43.48 1Q 5A
5: 4001 - 5000 Hours - 65.00% $45.27 1Q 5A
6: 5001 - 6000 Hours - 70.00% $47.05 1Q 5A
7: 6001 - 7000 Hours - 75.00% $48.84 1Q 5A
8: 7001 - 8000 Hours - 80.00% $50.61 1Q 5A
9: 8001 - 9000 Hours - 85.00% $52.40 1Q 5A
10: 9001 - 10000 Hours - 85.00% $52.40 1Q 5A
POWER EQUIPMENT OPERATORS
ALL EQUIPMENT
1: 0 - 1000 Hours - 65.00% $26.24 1M 5D 8D
2: 1001 - 2000 Hours - 70.00% $27.50 1M 5D 8D
3: 2001 - 3000 Hours - 75.00% $28.77 1M 5D 8D
4: 3001 - 4000 Hours - 80.00% $30.03 1M 5D 8D
5: 4001 - 5000 Hours - 85.00% $31.30 1M 5D 8D
6: 5001 - 6000 Hours - 90.00% $32.56 1M 5D 8D
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
1: 0 - 1000 Hours - 65.00% $26.24
2: 1001 - 2000 Hours - 70.00% $27.50
3: 2001 - 3000 Hours - 75.00% $28.77
4: 3001 - 4000 Hours - 80.00% $30.03
5: 4001 - 5000 Hours - 85.00% $31.30
6: 5001 - 6000 Hours - 90.00% $32.56
POWER LINE CLEARANCE TREE TRIMMERS
TREE TRIMMER
1: 0 - 1000 Hours - 75.00% $27.82 4A 5A
2: 1001 - 2000 Hours - 80.00% $29.14 4A 5A
3: 2001 - 3000 Hours - 85.00% $30.44 4A 5A
4: 3001 - 4000 Hours - 90.00% $31.50 4A 5A
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
1: 0 - 1000 Hours - 40.00% $11.40 1
2: 1001 - 2000 Hours - 50.00% $14.25 1
3: 2001 - 3000 Hours - 55.00% $15.67 1
4: 3001 - 4000 Hours - 60.00% $17.09 1
5: 4001 - 5000 Hours - 65.00% $18.52 1
6: 5001 - 6000 Hours - 70.00% $19.94 1
7: 6001 - 7000 Hours - 80.00% $22.79 1
8: 7001 - 8000 Hours - 85.00% $24.22 1
9: 8001 - 9000 Hours - 85.00% $24.22 1
10: 9001 - 10000 Hours - 85.00% $24.22 1
RESIDENTIAL CARPENTERS
1: 1st Period - 60.00% $9.67 1
2: 2nd> Period - 65.00% $10.47 1
3: 3rd Period - 70.00% $11.28 1
4: 4th Period - 75.00% $12.08 1
5: 5th Period - 80.00% $12.89 1
6: 6th Period - 85.00% $13.69 1
7: 7th Period - 90.00% $14.50 1
8: 8th Period - 95.00% $15.30 1
RESIDENTIAL ELECTRICIANS
1: 1st Period - 50.00% $8.55 1
2: 2nd> Period - 60.00% $9.77 1
3: 3rd Period - 70.00% $11.40 1
4: 4th Period - 80.00% $13.02 1
RESIDENTIAL PLUMBERS & PIPEFITTERS
1: 1st Period - 50.00% $8.55 1
2: 2nd> Period - 55.00% $9.33 1
3: 3rd Period - 60.00% $10.18 1
4: 4th Period - 70.00% $11.88 1
5: 5th Period - 80.00% $13.58 1
6: 6th Period - 90.00% $15.27 1
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
1: 0 - 2000 Hours - 50.00% $25.04 1B 5I
2: 2001 - 3000 Hours - 55.00% $26.54 1B 5I
3: 3001 - 4000 Hours - 60.00% $28.12 1B 5I
4: 4001 - 5000 Hours - 65.00% $30.00 1B 5I
5: 5001 - 6000 Hours - 70.00% $32.01 1B 5I
6: 6001 - 7000 Hours - 75.00% $33.72 1B 5I
ROOFERS
1: 0 - 700 Hours - 60.00% $8.55 1
2: 701 - 1400 Hours - 70.00% $9.80 1
3: 1401 - 2100 Hours - 80.00% $11.20 1
4: 2101 - 2800 Hours - 85.00% $11.90 1
5: 2801 - 3500 Hours - 90.00% $12.60 1
6: 3501 - 4200 Hours - 95.00% $13.30 1
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
1: 0 - 2000 Hours - 50.00% $25.04 1B 5I
2: 2001 - 3000 Hours - 55.00% $26.54 1B 5I
3: 3001 - 4000 Hours - 60.00% $28.12 1B 5I
4: 4001 - 5000 Hours - 65.00% $30.00 1B 5I
5: 5001 - 6000 Hours - 70.00% $32.01 1B 5I
6: 6001 - 7000 Hours - 75.00% $33.72 1B 5I
7: 7001 - 8000 Hours - 80.00% $35.49 1B 5I
8: 8001 - 9000 Hours - 85.00% $37.13 1B 5I
9: 9001 - 10000 Hours - 90.00% $38.75 1B 5I
SOFT FLOOR LAYERS
1: 0 - 1000 Hours - 50.00% $13.47 1N 5A
2: 1001 - 2000 Hours - 55.00% $15.10 1N 5A
3: 2001 - 3000 Hours - 60.00% $15.99 1N 5A
4: 3001 - 4000 Hours - 70.00% $17.77 1N 5A
5: 4001 - 5000 Hours - 80.00% $19.55 1N 5A
6: 5001 - 6000 Hours - 90.00% $21.33 1N 5A
SPRINKLER FITTERS (FIRE PROTECTION)
GRADE 1 (INDENTURED AFTER APRIL 1, 2000)
1: 0 - 1000 Hours - 45.00% $8.55 1
2: 1001 - 2000 Hours - 50.00% $8.55 1
3: 2001 - 3000 Hours - 55.00% $8.55 1
4: 3001 - 4000 Hours - 60.00% $8.89 1
GRADE 1 (INDENTURED BEFORE APRIL 1, 2000)
1: 0 - 1000 Hours - 40.00% $8.55 1
2: 1001 - 2000 Hours - 45.00% $8.55 1
3: 2001 - 3000 Hours - 50.00% $8.55 1
4: 3001 - 4000 Hours - 55.00% $8.55 1
GRADE 2 (INDENTURED AFTER APRIL 1, 2000)
1: 0 - 1000 Hours - 65.00% $9.63 1
2: 1001 - 2000 Hours - 70.00% $10.37 1
3: 2001 - 3000 Hours - 75.00% $11.12 1
4: 3001 - 4000 Hours - 80.00% $11.86 1
5: 4001 - 5000 Hours - 85.00% $12.60 1
6: 5001 - 6000 Hours - 90.00% $13.34 1
GRADE 2 (INDENTURED BEFORE APRIL 1, 2000)
1: 0 - 1000 Hours - 60.00% $8.89 1
2: 1001 - 2000 Hours - 65.00% $9.63 1
3: 2001 - 3000 Hours - 70.00% $10.37 1
4: 3001 - 4000 Hours - 75.00% $11.12 1
5: 4001 - 5000 Hours - 80.00% $11.86 1
6: 5001 - 6000 Hours - 85.00% $12.60 1
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL
1: 0 - 800 Hours - 55.00% $20.13 1B 5I
2: 801 - 1600 Hours - 60.00% $21.44 1B 5I
3: 1601 - 2400 Hours - 65.00% $22.76 1B 5I
4: 2401 - 3200 Hours - 70.00% $24.07 1B 5I
5: 3201 - 4000 Hours - 80.00% $26.70 1B 5I
6: 4001 - 4800 Hours - 85.00% $28.01 1B 5I
TERRAZZO WORKERS & TILE SETTERS
1: 0 - 700 Hours - 50.00% $19.40 2M 5A
2: 701 - 2100 Hours - 60.00% $21.49 2M 5A
3: 2101 - 2800 Hours - 70.00% $23.59 2M 5A
4: 2801 - 3500 Hours - 80.00% $25.69 2M 5A
5: 3501 - 4200 Hours - 90.00% $27.78 2M 5A
6: 4201 - 4900 Hours - 95.00% $28.83 2M 5A
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
1: 0 - 700 Hours - 60.00% $19.04 2M 5A
2: 701 - 2100 Hours - 70.00% $20.73 2M 5A
3: 2101 - 2800 Hours - 80.00% $22.42 2M 5A
4: 2801 - 3500 Hours - 90.00% $24.11 2M 5A
TRAFFIC CONTROL STRIPERS
1: 0 - 500 Hours - 60.00% $15.90 1K 5A
2: 501 - 1000 Hours - 60.00% $21.22 1K 5A
3: 1001 - 2333 Hours - 60.00% $24.95 1K 5A
4: 2334 - 4666 Hours - 73.00% $29.16 1K 5A
5: 4667 - 7000 Hours - 88.00% $34.01 1K 5A
TRUCK DRIVERS
ALL TRUCKS
1: 0 - 1000 Hours - 70.00% $27.01 1N 5D 8M
2: 1001 - 2000 Hours - 80.00% $29.33 1N 5D 8M
3: 2001 - 3000 Hours - 90.00% $31.66 1N 5D 8M

End of main content, page footer follows.

© Washington State Dept. of Labor and Industries. Use of this site is subject to the laws of the state of Washington.