Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: abatement
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Asbestos Abatement Project Notice of Intent and L&I DOSH Asbestos Program

Notice is not required for any asbestos project involving less than forty-eight (48) square feet of surface area, or less than ten (10) linear feet of pipe unless the surface area of the pipe is greater than forty-eight (48) square feet. Get instructions to complete the form.



Formulario
F413-025-000
 
Q&A: Stay of Abatement Date

Fact sheet: Explains how an employer requests a "stay of abatement date." Effective July 1, 2012, an employer must fix a hazard cited in a workplace inspection during appeal unless he or she has requested and been granted a stay of abatement date.



Publicación
F417-235-000
 
Safety Standards for Administrative Rules WAC 296-900

Administrative Rules and the DOSH Administrative Manual affords employers the right to administrative and judicial review of alleged violations, initial penalties and abatement periods.



Manual
F414-136-000
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.