Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: alteration
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Alteration Fire Safety Pre-Inspection Checklist

Checklist for homeowners on how to upgrade their pre-HUD homes to approach the HUD standards in the area of fire safety.



Formulario
F622-011-000

Otro(s) idioma(s):
Español
 
Factory Assembled Structures Alteration Application

Used by a homeowner or contactor to request a field inspection for an alteration to a manufactured or mobile home.

Allow 1-2 days for a response to alteration applications for Manufactured/Mobile Homes.

All other alteration applications, allow 2-3 weeks for a response. Accuracy and completeness speeds up the processing time.



Formulario
F622-036-000
 
Alteration Re-Roofing for Low Slope Roofing

Checklist used by the contractor when altering a low slope roof.



Formulario
F622-039-000
 
Alteration Polybutylene Re-Pipe Pre-Inspection Checklist

This checklist is used by the contractor when altering a polybutylene re-pipe. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-053-000
 
Minimum Header Structural Requirements for Manufactured Home Alterations

For use on sidewalls only. Maximum of one new opening up to 11-6 wide per sidewall. Edge of opening to be no closer than 4 from end of sidewall.



Formulario
F622-080-000
 
Safety Standards for Construction Work WAC 296-155

Construction work shall mean and include all or any part of excavation, construction, erection, alteration, repair, demolition, and dismantling, of buildings and other structures.



Manual
F414-033-000
 
Installation Application for Elevators

Used for installation application for elevators (new, renewals, and alterations).

Allow 30 business days for a response. Accuracy and completeness speeds up the processing time.
 
Residential Incline Chair Lifts: Allow one week for a response.



Formulario
F621-005-000
 
Temporary Licensed Elevator Mechanic

This temporary license is limited to the mechanical and electrical operation, construction, installation, alteration, maintenance, inspection, relocation and repair of conveyances.



Formulario
F621-068-000
 
Permit Refund Request

A form to request a refund for an electrical work permit, elevator permit, or factory-assembled structure alteration permit.



Formulario
F621-105-000
 
Is it a Manufactured / Mobile Home?

If your home has any of the items in this document, it is a manufactured / mobile home and requires inspections for all alterations by L&I's Factory Assembled Structures Section.



Formulario
F622-043-000
 
Your Manufactured/Mobile Home

Pamphlet/booklet: Covers things you should consider when altering your home. Defines what is meant by alteration, repair and replacement and includes tips for hiring a registered contractor. It also includes contact information for L&I Consumer Assistance Program for owners of new manufactured/mobile homes.



Publicación
F622-049-000

Otro(s) idioma(s):
Español
 
Lista de Comprobación para la Preinspección de Seguridad contra Incendios

Lista de comprobación para dueños de casas sobre cómo mejorar sus casas antes de la preinspección de HUD para alcanzar los estándares en el área de seguridad contra incendios.



Formulario
F622-011-999

Otro(s) idioma(s):
Inglés
 
Electric / Gas Conversion Pre-Inspection Checklist

This checklist is generic in content and may not include all requirements for your particular installation. The manufacturer's installation instruction must be adhered to and available to the inspector at the time of the inspection.



Formulario
F622-013-000
 
Air Conditioner/Heat Pump Pre-Inspection Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-014-000
 
Wood / Pellet Stove / Fireplace Pre-Inspection Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-015-000
 
Low Voltage Fire / Intrusion Alarm Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-038-000
 
Gas Room Heaters Pre-Inspection Checklist

This checklist is used by the contractor when installing gas room heaters. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-045-000
 
Gas Piping Test Affidavit

You fill out, print and make a copy of this form on your company's letterhead. This affidavit must be available for the L&I inspector when the inspection is made.



Formulario
F622-048-000
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.