Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: boiler
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Non-Compliance Report - Boiler & Pressure Vessel Inspection
Used by L&I inspectors when a boiler or pressure vessel does not pass inspection. You can only mail or fax this form to L&I. E-mailed forms are NOT accepted.

Formulario
F620-012-000
 
Board of Boiler Rules Interpretation and Revision Request Form
Used to submit written requests for interpretations and revisions to the definitions, rules and regulations found in WAC 296-104. These must be submitted 45 days prior to the Board of Boiler Rules Meeting date. To use this form, left click on the link and select SAVE TARGET AS and save to your desktop. Open in WORD, complete form, select PRINT, SEND TO, MAIL or DELIVERY DOCUMENT ONLY in care of Chief, Boiler Inspector.

Formulario
F620-017-000
 
Operating Boilers Safely
Fact sheet: Explains what you need to know to keep your boilers and pressure vessels operating safety. Provides an overview of inspection requirements, frequency and fees.

Publicación
F620-025-000
 
Boiler / Pressure Vessel Water Heater Installation or Reinstallation Permit
This form is filled out by the installer, contractor and/or owner who wants to install or reinstall a boiler.

Formulario
F620-032-000
 
Boiler/Pressure Vessel Clearance Variance Request
To request a clearance variance on a boiler or pressure vessel. You can only mail or fax this form to L&I. E-mailed forms are not accepted.

Formulario
F620-041-000
 
Rental Boiler Operating Permit - Good at this Location Only
To request a permit to use a rental boiler at one location only.

Formulario
F620-042-000
 
Historical Boilers Inspection Guideline
Inspection sheet for boiler inspectors. 4 pages.

Formulario
F620-043-000
 
Incident Report Boiler or Pressure Vessel
Used for the reporting of incident with boilers or a pressure vessels.

Formulario
F620-044-000
 
Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers
Checklist which reflects the most common violations encountered by Field Inspectors. This checklist should be gone through prior to requesting inspection of Hot Water Heating or Hot Water Supply Boilers

Formulario
F620-050-000
 
Pre-Inspection Checklist for Low Pressure Steam Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Low Pressure Steam Boilers



Formulario
F620-052-000
 
Pre-Inspection Checklist for High Pressure Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of High Pressure Boilers



Formulario
F620-053-000
 
Board of Boiler Rules Extension of Inspection Frequency Request Form
Board of Boiler Rules Extension of Inspection Frequency Request Form

Formulario
F620-055-000
 
Board of Boiler Rules Washington State Specials Request Form
Board of Boiler Rules Washington State Specials Request Form

Formulario
F620-057-000
 
Shop and Field Inspection Report
Used by L&I inspectors when they inspect boilers.

Formulario
F620-027-000
 
Faulty Water Heaters and Kids Don't Mix
Fact sheet: Designed for operators of childcare facilities, this fact sheet explains the importance of keeping boilers and pressure vessels operating safety. Provides an overview of inspection requirements, frequency, and fees.

Publicación
F620-059-000
 
Inservice Inspection checklist
Inservice Inspection checklist for power boilers, low pressure boilers, pressure vessels, and hot water boilers.

Formulario
F620-060-000
 
Application for Certificate of Competency as an Inspector of Pressure Retaining Items
To apply for a certificate of competency as an Inspector of Pressure Retaining items. You can only mail or fax this form to L&I. Emailed forms are not accepted. NOTE: Applications MUST be received no later than 30 days prior to the exam date. Incomplete applications WILL NOT be accepted.

Formulario
F620-040-000
 
Pre-Inspection Checklist for Potable Water Heaters - ASME "HLW" Stamped Water Heaters
Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Potable Water Heaters-HLW

Formulario
F620-051-000
 
Chief Inspector Clarification and Interpretation Request Form
Chief Inspector Clarification and Interpretation Request Form

Formulario
F620-056-000
 





End of main content, page footer follows.