Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: inspection
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Charter Vessel Inspection

Form used for the applicant to complete a Certification of Inspection of a charter boat.



Formulario
F416-058-000
 
Agency Requested Inspection
Used by non-L&I agencies and jurisdictional authorities to request an inspection on an electrical hazard.

Formulario
F500-025-000
 
Application to Establish an Account and Access to L&I's Electrical Permit & Inspection System (EPIS) with L&I's Miscellaneous Accounts

To request access to L&I's EPIS - Miscellaneous Accounts



Formulario
F500-054-000
 
Application to Access L&I's Electrical Permit and Inspection System (EPIS) from SecureAccess Washington and Utilize Contractor Deposit Account via the Internet
To establish a contractor deposit account by an electrical contactor or registered construction contractors who are legally required to purchase electrical work permits from L&I.

Formulario
F500-055-000
 
Electrical Inspection Witness Statement
Used to gather information from a person who was a witness to electrical work that is being investigated by L&I.

Formulario
F500-087-000
 
Non-Compliance Report - Boiler & Pressure Vessel Inspection
Used by L&I inspectors when a boiler or pressure vessel does not pass inspection. You can only mail or fax this form to L&I. E-mailed forms are NOT accepted.

Formulario
F620-012-000
 
Shop and Field Inspection Report
Used by L&I inspectors when they inspect boilers.

Formulario
F620-027-000
 
Historical Boilers Inspection Guideline
Inspection sheet for boiler inspectors. 4 pages.

Formulario
F620-043-000
 
Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers
Checklist which reflects the most common violations encountered by Field Inspectors. This checklist should be gone through prior to requesting inspection of Hot Water Heating or Hot Water Supply Boilers

Formulario
F620-050-000
 
Pre-Inspection Checklist for Potable Water Heaters - ASME "HLW" Stamped Water Heaters
Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Potable Water Heaters-HLW

Formulario
F620-051-000
 
Pre-Inspection Checklist for Low Pressure Steam Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of Low Pressure Steam Boilers



Formulario
F620-052-000
 
Pre-Inspection Checklist for High Pressure Boilers

Checklist which reflects the most common violations found by Field Inspectors. This checklist should be gone through prior to calling for an inspection of High Pressure Boilers



Formulario
F620-053-000
 
Board of Boiler Rules Extension of Inspection Frequency Request Form
Board of Boiler Rules Extension of Inspection Frequency Request Form

Formulario
F620-055-000
 
Inservice Inspection checklist

Inservice Inspection checklist for power boilers, low pressure boilers, pressure vessels, and hot water boilers.



Formulario
F620-060-000
 
Construction Elevator Installation Application and Inspection Data Report

Used by companies to apply for an Construction Elevator (Hoist) at a job site. One application per car and companies need to contact the Elevator Section for the appropriate installation and operating fee.

Allow two weeks for a response. Accuracy and completeness speeds up the processing time.



Formulario
F621-001-000
 
Alteration Fire Safety Pre-Inspection Checklist

Checklist for homeowners on how to upgrade their pre-HUD homes to approach the HUD standards in the area of fire safety.



Formulario
F622-011-000

Otro(s) idioma(s):
Español
 
Electric / Gas Conversion Pre-Inspection Checklist

This checklist is generic in content and may not include all requirements for your particular installation. The manufacturer's installation instruction must be adhered to and available to the inspector at the time of the inspection.



Formulario
F622-013-000
 
Air Conditioner/Heat Pump Pre-Inspection Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-014-000
 
Wood / Pellet Stove / Fireplace Pre-Inspection Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-015-000
 
Steel or Wrought-Iron Gas Line Pre-Inspection Checklist

This checklist is used by the contractor when installing steel or wrought-iron gas line. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-044-000
 
Gas Room Heaters Pre-Inspection Checklist

This checklist is used by the contractor when installing gas room heaters. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-045-000
 
Copper Tubing Gas Line Pre-Inspection Checklist

This checklist is used by the contractor when installing gas lines with copper tubing. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-046-000
 
Alteration Polybutylene Re-Pipe Pre-Inspection Checklist

This checklist is used by the contractor when altering a polybutylene re-pipe. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-053-000
 
Vendor / Medical Conversion Units Pre-Inspection Checklist

Pre-Inspection Checklist to assist vendor owners, manufacturers, and others on what they need to know to get their vendor/medical unit approved by Labor and Industries.



Formulario
F622-072-000
 
Structural Inspection Request Questionnaire

Structural Inspection Request Questionnaire



Formulario
F622-075-000
 
Roof Affidavit and Structural Inspection Request

The purpose of the manufactured home roof affidavit is to provide timely inspections and communications between the contractor and/or owner and FAS inspectors and field staff.

A structural inspection request questionnaire will not be required when a roof change out occurs if no structural changes are made in the roof sub-surface and roof cavity. Example: Repairing or replacing the roof trusses, rafters, ridge beam and the replacement of not more than (4) 4’x 8’ of roof sheathing.



Formulario
F622-076-000
 
Cranes, Derricks and Material Handling Devices Worksheet for Maritime Industry

Use this form for the inspection of cranes, derricks and materials handling devices on waterfront operations



Formulario
F416-051-000
 
Q&A: Stay of Abatement Date

Fact sheet: Explains how an employer requests a "stay of abatement date." Effective July 1, 2012, an employer must fix a hazard cited in a workplace inspection during appeal unless he or she has requested and been granted a stay of abatement date.



Publicación
F417-235-000
 
Electrical Work on Residential Property: What You Should Know Before Work Begins
Fact Sheet: Explains to property owners the importance of electrical permits, inspections and approvals. An electrical permit is required for most new, remodel and maintenance electrical work.

Publicación
F500-078-000
 
Electrical Work on Commercial Property: What You Should Know Before Work Begins
Fact Sheet: Explains to commercial property owners the importance of electrical permits, inspections and approvals. An electrical permit is required for most new, remodel and maintenance electrical work.

Publicación
F500-109-000
 
Questions and Answers about Electrical Safety
Fact Sheet: Answers questions about training and certification/licensing requirements for those who perform electrical installations, and electrical work that requires a permit and inspection.

Publicación
F500-110-000
 
Before Electrical Sign Work Begins: What Electrical Sign Contractors and Electricians Should Know
Fact Sheet: Explains work that is allowed and not allowed under (04) Sign Scope of Work and what electrical sign contractors and electricians should know before doing sign work. Also covers electrical Class B labels and electrical permits, inspections and fees.

Publicación
F500-111-000
 
Electrical Program Contacts

Fact Sheet: Provides information for requesting electrical inspections, including telephone numbers and locations of L&I offices that handle electrical inspections.



Publicación
F500-114-000
 
Electrical Safety Tips for Your Home: Protect Your Family and Your Property
Pamphlet/Booklet: Provides information to help consumers properly handle electrical equipment and appliances, know the required permits and inspections for electrical work, and verify licenses and certifications before having electrical work performed.

Publicación
F500-115-000
 
Green Power Generation System Installation: What You Should Know Before Doing Any Electrical Work
Fact sheet: Explains that an electrical permit and inspection are required for most new, remodel, and maintenance electrical work. Provides information specific to the installation of green power generation systems.

Publicación
F500-116-000
 
Operating Boilers Safely
Fact sheet: Explains what you need to know to keep your boilers and pressure vessels operating safety. Provides an overview of inspection requirements, frequency and fees.

Publicación
F620-025-000
 
Faulty Water Heaters and Kids Don't Mix
Fact sheet: Designed for operators of childcare facilities, this fact sheet explains the importance of keeping boilers and pressure vessels operating safety. Provides an overview of inspection requirements, frequency, and fees.

Publicación
F620-059-000
 
New Elevator Installation Checklist

Checklist for the elevator company/contractor to complete before the call L&I for an elevator inspection. Includes December 2010 letter on ASME checklists.



Formulario
F621-057-000
 
Temporary Licensed Elevator Mechanic

This temporary license is limited to the mechanical and electrical operation, construction, installation, alteration, maintenance, inspection, relocation and repair of conveyances.



Formulario
F621-068-000
 
Factory Assembled Structures Alteration Application

Used by a homeowner or contactor to request a field inspection for an alteration to a manufactured or mobile home.

Allow 1-2 days for a response to alteration applications for Manufactured/Mobile Homes.

All other alteration applications, allow 2-3 weeks for a response. Accuracy and completeness speeds up the processing time.



Formulario
F622-036-000
 
Flood Damaged Manufactured Home Checklist

Checklist on how to repair a flood damaged manufactured home. After the contractor has done all that is required by the checklist they call L&I for an inspection.



Formulario
F622-040-000
 
Is it a Manufactured / Mobile Home?

If your home has any of the items in this document, it is a manufactured / mobile home and requires inspections for all alterations by L&I's Factory Assembled Structures Section.



Formulario
F622-043-000
 
Gas Piping Test Affidavit

You fill out, print and make a copy of this form on your company's letterhead. This affidavit must be available for the L&I inspector when the inspection is made.



Formulario
F622-048-000
 
RCW 43.22.380 Exemptions Fire and Safety Checklist for Vendor/Medical Conversion Units
Generic Checklist to determine if the particular installation includes all requirements prior to calling for an inspection. Must be able to answer YES to all questions prior to calling.

Formulario
F622-073-000
 
Poster - An Unprotected Trench is an Early Grave

Poster: Trench safety information for employers. Features tips to prevent cave-ins, and proper inspection proceedures. Get poster printing tips.



Cartel
FSP0-912-000
 
Boiler / Pressure Vessel Water Heater Installation or Reinstallation Permit
This form is filled out by the installer, contractor and/or owner who wants to install or reinstall a boiler.

Formulario
F620-032-000
 
Application for Certificate of Competency as an Inspector of Pressure Retaining Items

To apply for a certificate of competency as an Inspector of Pressure Retaining items. You can only mail or fax this form to L&I. Emailed forms are not accepted. NOTE: Applications MUST be received no later than 30 days prior to the exam date. Incomplete applications WILL NOT be accepted.



Formulario
F620-040-000
 
Extension Request

This form is to request a time extension from an unforeseen circumstances for overdue corrections for conveyances.



Formulario
F621-053-000
 
Department of Labor and Industries Home Modification Acknowledgement of Responsibilities

Used by both workers and bidding contractors to read, sign and submit to L&I to verify that they have read, understand and accept their respective responsibilities in the home modification process.



Formulario
F247-003-000

Otro(s) idioma(s):
Español
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.