Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: roofing
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Alteration Re-Roofing for Low Slope Roofing

Checklist used by the contractor when altering a low slope roof.



Formulario
F622-039-000
 
Roof Affidavit and Structural Inspection Request

The purpose of the manufactured home roof affidavit is to provide timely inspections and communications between the contractor and/or owner and FAS inspectors and field staff.

A structural inspection request questionnaire will not be required when a roof change out occurs if no structural changes are made in the roof sub-surface and roof cavity. Example: Repairing or replacing the roof trusses, rafters, ridge beam and the replacement of not more than (4) 4’x 8’ of roof sheathing.



Formulario
F622-076-000
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.