Obtenga un formulario o publicación

Escriba todo el título del documento o una parte, la descripción o el número:     

Formularios más populares  |  Carteles requeridos del lugar de trabajo  |  Formularios y publicaciones en español


Resultados para: structure
Vea:    Ordenar por:       
Título/Descripción:

Búsqueda de palabras clave:  
Tipo:

Application to Establish an Factory Assembled Structure Deposit Account with the Dept. of Labor and Industries

Use to establish a factory assembled structure (FAS) deposit account. FAS deposit accounts are for businesses or other entities that are not currently licensed or registered with L&I as electrical or construction contractors but are legally required to purchase work permits from L&I. (3 pgs)



Formulario
F120-116-000
 
Structured Settlement Income and Expense Worksheet

This form is completed by the injured worker, or their representative in conjunction with an Application for Structured Settlement.



Formulario
F240-007-000
 
Application for Amusement Ride or Air Supported Structure Operating Permit

To apply for a decal for an amusement ride or air supported structure.



Formulario
F500-010-000
 
Factory Assembled Structures Alteration Application

Used by a homeowner or contactor to request a field inspection for an alteration to a manufactured or mobile home.

Allow 1-2 days for a response to alteration applications for Manufactured/Mobile Homes.

All other alteration applications, allow 2-3 weeks for a response. Accuracy and completeness speeds up the processing time.



Formulario
F622-036-000
 
Account Deposit for Factory Assembled Structures Account Holders

You must have a contractor license number or have completed an application for a miscellaneous account to use this form.



Formulario
F622-081-000
 
Plan Approval Request - Factory Built Structures and Commercial Coaches

A manufacturer of factory-built structures and/or commercial coaches uses this form to submit plans to L&I for review.



Formulario
F623-006-000
 
Application for Insignia for Factory Assembled Structures

Manufacturers uses this form to apply for an official insignia for a factory-built structure that has a plan approval number.



Formulario
F623-014-000
 
Settling your L&I claim might be right for you: A new option for injured workers over 55

Pamphlet/booklet: Explains structured settlement and provides an overview of eligibility and the application and approval processes. The audience for this pamphlet is injured workers who might be eligible.



Publicación
F240-003-000

Otro(s) idioma(s):
Español
 
Settling your injured worker's L&I claim: A new option for injured workers over 55

Pamphlet/booklet: Explains structured settlement and provides an overview of eligibility and the application and approval processes. The audience for this pamphlet is employers covered by the state's workers' compensation program. Self-insured employers should read Publication F240-005-000.



Publicación
F240-004-000
 
HCFA Proprietary Format Companion Guide
This guide details the HCFA proprietary format structure and provides information regarding electronic billing to the department via Provider Express Billing (PEB).

Formulario
F245-394-000
 
ASC X12N 005010 EDI Transactions Companion Guide
Description: This guide details the HIPAA ASC X12N 005010 format structure for EDI and provides information regarding electronic billing To the department via Provider Express Billing (PEB)

Manual
F245-398-000
 
Pharmacy Companion Guide

This guide details the HIPAA ASC X12N 004010 format structure for 835 Pharmacy Remittance Advice and provides information regarding electronic billing to the department via Provider Express billing (PEB)



Manual
F245-400-000
 
Safety Standards for Construction Work WAC 296-155

Construction work shall mean and include all or any part of excavation, construction, erection, alteration, repair, demolition, and dismantling, of buildings and other structures.



Manual
F414-033-000
 
Safety Standsards for WAC 296-874 - Scaffolds

Scaffolds, Chapter 296-874 WAC, applies to suspended and supported scaffolds, including their supporting structure and anchorage points. A scaffold is a temporary elevated platform, including its supporting structure and anchorage points, used for supporting employees or materials. A suspended scaffold is one or more platforms suspended from an overhead structure by ropes or other non-rigid means.



Manual
F414-128-000
 
Protect Yourself and Your Family from Lead Poisoning
Pamphlet/booklet: Explains the risks of lead exposure for workers who work on outdoor steel structures, and harmful effects on workers and their families. It includes a poster about the importance of safe work practices and procedures.

Publicación
F417-214-000
 
Tractor Safety: Rollover Protection and Seatbelts

Pamphlet: Summarizes the safety rules for rollover protective structures (ROPS) and seatbelts on tractors. Also lists exemptions and provides other information about safe operation of tractors.



Publicación
F417-234-000

Otro(s) idioma(s):
Español
 
Permit Refund Request

A form to request a refund for an electrical work permit, elevator permit, or factory-assembled structure alteration permit.



Formulario
F621-105-000
 
Plan Approval Request - Conversion Vendor / Medical Units

Used in requesting a plan approval for Conversion Vendor or Medical Unit factory-assembled structures.



Formulario
F622-035-000
 
Is it a Manufactured / Mobile Home?

If your home has any of the items in this document, it is a manufactured / mobile home and requires inspections for all alterations by L&I's Factory Assembled Structures Section.



Formulario
F622-043-000
 
Notification to Local Enforcement Agency

L&I sends this form to notify the local agencies when a factory-built structure is being shipped within a county or city limits.



Formulario
F623-013-000
 
Application for Insignia Conversion Vendor/Medical Units

Used to apply for an official insignia for conversion vendor or medical unit factory-assembled structures. See sample form for instructions about how to fill out the form correctly.



Formulario
F623-021-000
 
Washington Contractor's License Bond Entity Change Rider

Used by the bond company to show a change in the business structure of a contractor's business.



Formulario
F625-103-000
 
Plan Approval Request - Recreational Vehicles and Recreational Park Trailers

Plans to build recreational vehicles or park trailers need approval from L&I. This form is used as part of the approval process.



Formulario
F622-006-000
 
Alteration Fire Safety Pre-Inspection Checklist

Checklist for homeowners on how to upgrade their pre-HUD homes to approach the HUD standards in the area of fire safety.



Formulario
F622-011-000

Otro(s) idioma(s):
Español
 
Lista de comprobación para la preinspección de seguridad contra incendios

Lista de comprobación para dueños de casas sobre cómo mejorar sus casas antes de la preinspección del Departamento de Vivienda y Desarrollo Urbano (HUD, por su sigla en inglés) para alcanzar los estándares en el área de seguridad contra incendios.



Formulario
F622-011-999

Otro(s) idioma(s):
Inglés
 
Electric / Gas Conversion Pre-Inspection Checklist

This checklist is generic in content and may not include all requirements for your particular installation. The manufacturer's installation instruction must be adhered to and available to the inspector at the time of the inspection.



Formulario
F622-013-000
 
Air Conditioner/Heat Pump Pre-Inspection Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-014-000
 
Wood / Pellet Stove / Fireplace Pre-Inspection Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-015-000
 
Low Voltage Fire / Intrusion Alarm Checklist

This checklist is designed to be generic in content and may not include all requirements for your particular installation.



Formulario
F622-038-000
 
Alteration Re-Roofing for Low Slope Roofing

Checklist used by the contractor when altering a low slope roof.



Formulario
F622-039-000
 
Flood Damaged Manufactured Home Checklist

Checklist on how to repair a flood damaged manufactured home. After the contractor has done all that is required by the checklist they call L&I for an inspection.



Formulario
F622-040-000
 
Steel or Wrought-Iron Gas Line Pre-Inspection Checklist

This checklist is used by the contractor when installing steel or wrought-iron gas line. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-044-000
 
Gas Room Heaters Pre-Inspection Checklist

This checklist is used by the contractor when installing gas room heaters. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-045-000
 
Copper Tubing Gas Line Pre-Inspection Checklist

This checklist is used by the contractor when installing gas lines with copper tubing. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-046-000
 
Gas Piping Test Affidavit

You fill out, print and make a copy of this form on your company's letterhead. This affidavit must be available for the L&I inspector when the inspection is made.



Formulario
F622-048-000
 
Your Manufactured/Mobile Home

Pamphlet/booklet: Covers things you should consider when altering your home. Defines what is meant by alteration, repair and replacement and includes tips for hiring a registered contractor. It also includes contact information for L&I Consumer Assistance Program for owners of new manufactured/mobile homes.



Publicación
F622-049-000

Otro(s) idioma(s):
Español
 
Alteration Polybutylene Re-Pipe Pre-Inspection Checklist

This checklist is used by the contractor when altering a polybutylene re-pipe. Be sure you can answer YES to all questions before calling L&I for an inspection.



Formulario
F622-053-000
 
Homeowners Manufactured / Mobile Home Variance Request

This variance request applies only to the installations performed by a previous owner and does not apply to any home during the warranty period.



Formulario
F622-054-000
 
Decertification of Manufactured and Mobile Homes

This document shows the steps to decertify a manufactured or mobile home.



Formulario
F622-063-000
 
Application for Insignia for Commercial Coaches

Manufacturer uses this form to apply for an official insignia for commercial coaches that have a plan approval number.



Formulario
F623-019-000
 
Casas prefabricadas y móviles: lo que los dueños de casas y contratistas deben saber al modificar una vivienda

Folleto: Cubre asuntos que usted debe considerar al modificar su casa. Define lo que significa modificación, reparación y sustitución e incluye consejos para contratar contratistas registrados. También incluye información de comunicación para el Programa de L&I para Asistencia al Consumidor para dueños de casas prefabricadas /móviles.



Publicación
F622-049-999

Otro(s) idioma(s):
Inglés
 
Structural Inspection Request Questionnaire

Structural Inspection Request Questionnaire



Formulario
F622-075-000
 
Roof Affidavit and Structural Inspection Request

The purpose of the manufactured home roof affidavit is to provide timely inspections and communications between the contractor and/or owner and FAS inspectors and field staff.

A structural inspection request questionnaire will not be required when a roof change out occurs if no structural changes are made in the roof sub-surface and roof cavity. Example: Repairing or replacing the roof trusses, rafters, ridge beam and the replacement of not more than (4) 4’x 8’ of roof sheathing.



Formulario
F622-076-000
 
Llegar a un acuerdo sobre su reclamo de L&I puede ser lo correcto para usted - Una nueva opción para los trabajadores lesionados que tienen más de 55 años de edad (English/español)

Folleto: Explica el acuerdo sobre beneficios de compensación para trabajadores y proporciona un resumen de los requisitos que debe reunir y el proceso de solicitud y aprobación.  La audiencia para este folleto son los trabajadores lesionados los cuales pueden tener derecho a un acuerdo.



Publicación
F240-003-999

Otro(s) idioma(s):
Inglés
 





End of main content, page footer follows.

Access Washington en Español

© Depto. de Labor e Industrias del Estado de Washington. El uso de éste sitio del Internet está sujeto a las leyes del Estado de Washington.