| Prevailing Wage Policies | ||
|
|||||||
Search Policies
This is an initial list of current public works policies regarding prevailing wage.
| Prevailing Wage Policies | |||
Get
help downloading files. These files are all in Acrobat (.PDF) format.
|
|||
| Policy Number | Policy Subject | Date |
|
| 01-04 | HVAC Air Balancing | 10-20-04 |
43 KB |
| 01-04-A | HVAC Air Balancing #2 | 3-17-06 |
48 KB |
| 01-04-B | HVAC Air Balancing #3 | 3-17-06 |
54 KB |
| 01-06 | Exclusion of Tunnel Differential | 4-20-06 |
15 KB |
| 02-06 | Packaged Pre-Engineered Metal Buildings Scope | 5-8-06 |
43 KB |
| 02-06-A | Packaged vs. Non-Packaged Pre-Engineered Metal Buildings | 5-8-06 |
15 KB |
| 03-06 | Recycling Service Drop Boxes | 5-30-06 |
17 KB |
| 04-06 | Sheet Metal Roofing Scope | 6-8-06 |
15 KB |
| 05-06 | On-line Lottery Ticketing System | 8-1-06 |
16 KB |
| 06-06 | Baggage Conveyor and Dispenser | 8-28-06 |
18 KB |
| 07-06 | Modular Block Walls | 9-12-06 |
13 KB |
| 08-06 | Overtime | 11-17-06 |
23 KB |
| 09-06 | Automated Meter | 12-20-06 |
31 KB |
| 10-06 | Drywaller | 12-21-06 |
33 KB |
| 11-06 | Turnkey Project | 12-28-06 |
34 KB |
| 01-07 | Fabricated Concrete | 1-5-07 |
35 KB |
| 02-07 | Drywaller #2 | 1-26-07 |
32 KB |
| 03-07 | Stoner Electric Automated Door Systems | 3-19-07 |
39 KB |