| Document Information | ||
|---|---|---|
Get help downloading & printing files. |
||
| Title |
|
|
| Description | This checklist is used by the contractor when installing gas lines with copper tubing. Be sure you can answer YES to all questions before calling L&I for an inspection. | |
| Detail | ||
| Form number | F622-046-000 | |
| Availability | Online only. See document above to download. |
|
| Keywords | checklist, factory assembled structure, factory built structures, gas piping, manufactured home, mobile home | |
| Languages | English | |
| Valid dates | 05-2008 | |
| Contact information |
Factory-Built Structures
|
|
| Related information | ||
| Documents | Gas Room Heaters Pre-Inspection Checklist |
|
| Web pages | Factory-Built Structures | |
Please take this survey to help improve the L&I website.
Take survey
(About 3 minutes)
© Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington.