Technical clarifications
- Sump Pump Testing (TC 20-03) - November 2023.
- Hatch Covers (TC 22-10) -- August 2023.
- MRL-HMRL Clarification & Testing (TC22-03) -- December 2022.
- Residential Elevator Door Hazard to Children (TC 22-01) - September 2022.
- Hoistway Wiring Final (TC 20-01) - March 2020.
- Elevator Communication Devices (TC 18-04) -- April 2019.
- Location of Elevator Equipment (TC 18-03) -- April 2019.
- Alterations, Repairs, & Replacements (TC 18-05) -- April 2019.
- Evacuation Plan - Elevator Entrapment (TC 18-07) -- April 2019.
- Private Residential Elevator Machine Rooms (TC 18-06) -- April 2019.
- Cellular Communication Devices (TC 18-08) -- April 2019.
- ADA & Communication Devices (TC 18-09) -- April 2019.
- Sump Pumps & Drains - Code Transition Issue (TC 18-10) -- April 2019.
- PRE Hoistway Doors (TC 18-02) -- April 2019.
- Material Lift Installation of Hoistway Doors (TC 08-01) -- April 2019.
Safety publications
- Implementation of the Civil Penalty for Failing to Perform Safety Tests -- January 2016.
- Rehmke Residential Inclined Elevators -- April 2013.
- Safety Alert! - Unsafe Shut-off Valve -- August 2010.
- Rehmke Hook - Safety Concern Letter -- June 2008.
Reports
- Elevator Program Performance Study -- December 2016.